Construction Advisory List

These files are in PDF format. You will need Adobe Acrobat Reader to view the PDF files which is available at our state Adobe Acrobat Access page.

Advisory Number Category Name
(File sizes from 16k to 572k unless otherwise indicated)
Effective Date
1 Pavement HMA Core Location Verification 03/17/2011
2 Office Insurance - Waiver of Subrogation 03/22/2011
Superseded by 2011 CPH Section III, Subsection D 11/16/2011
3 Safety Inertial Barrier Sand Moisture Content 05/17/2011
4 Payment Temporary Striping and Markings CA-4 is superseded by CA-38
5 Electrical Existing Above Ground Electrical Materials 08/18/2011
6 Pavement HMA Weight Ticket Certification by Weigh Master 10/19/2011
7 Materials Materials Certifications Delivery Date 10/19/2011
8 Payment Telephone Service 03/26/2012
9 Office/EEO Change Orders 03/28/2012
10 Utilities Utility Inspection and Billing 09/28/2012
11 Pavement HMA Cores in Shoulders less than 6 LF wide 11/01/2012
12 Office Change Orders 10/25/2012
13 Miscellaneous Traffic Stripes, Epoxy Resin
(Inspection Detail Revision 3/11/2013)
02/13/2013
14 Safety Traffic Director, Flagger 03/18/2024
(Revised)
15 Materials Buy America Guide 03/19/2014
16 Payment Materials Payments and Storage
(Stockpiled Materials)
03/14/2014
17 Payment HMA Payment for lots that were the subject to Removal and Replacement 03/14/2014
18 Safety Terminals and Anchorages (Beam Guide Rail End Treatments) Wood Blockout Rotation 04/07/2014
19 Payment Forcce Account - Idle Equipment 05/09/2014
20 Safety Tangent Guide Rail Terminal ET Plus 11/05/2014
21 Payment Estimate Payment and Materials Certifications 6/9/2015
22 Office Progress Schedules and Progress Schedule Updates 7/11/2019
(Revised)
23 Safety Night Operations and Lighting Requirements 6/25/2015
24 Miscellaneous Temporary Drainage Temporary Highway Lighting 12/27/2015
25 Miscellaneous FHWA's Pre-Approval and Final Approval in FMIS for PODI Projects 7/27/17
(Revised)
26 Miscellaneous Project Site Inspection 4/4/2016
27 Miscellaneous Reset Beam Guiderail 8/2/2016
28 Payment Final Estimate 4/10/2017
29 Safety Suspension of X-LITE Tangent Guide Rail Terminal usage 5/18/2017
30 Office RE Special Rate of Pay 11/20/2017
31 Pavement Asphalt Core Location Request 11/20/2017
32 Work Zone Safety Prelude to 2011 CPH Section VIII Subsection C 02/28/2018
33 Consultants Consultants - State Shutdown/State of Emergency/Emergency Closing 06/29/18
(Revised)
34 Miscellaneous Unacceptable Work 04/13/2018
35 Paving Use of HMA Release Agents 04/30/2018
36 Pavement Scabbing 07/18/2018
37 Plans 2016 Standard Constructions Details Roadway- Traffic Control- Bridge 08/31/2018
38 Payment Use of Traffic Stripes and Traffic Markings 01/25/2018
39 Paving Microsurfacing & Slurry Seal Aggregate & Emulsion 11/19/2018
40 Miscellaneous Vehicle Mileage Reimbursement 03/05/2019
41 Change Orders Contract Time Change Order 04/25/2019
42 Miscellaneous XP for Mandatory Training 04/25/2019
43 Legal Receipt of Subpoena and Notice for Deposition 10/25/2019
(Revised)
44 Time Request Notification and Approval of Benefit Time Use 05/29/2019
45 Work Zone Safety Traffic Control Devices/MASH 2016 09/23/2019
46 Embankment Reuse Of Millings For I-14 Soil Aggregate 02/06/2020
47 Contract Time Extension of Time Due to Covid-19 09/06/2022
48 Materials Material Storage Exclusions 05/20/2022
49 Office Consultant e-mail and Letterhead 12/05/2023